10.7 CSI TECHNICAL SPECIFICATIONS
This document is arranged in agreement with the recommended section and page format
developed by CSI (Construction Specifications Institute). All versions of this document
are copyrighted by American ConForm Industries and may not be used or duplicated
without permission.
SECTION 03135 EXPANDED POLYSTYRENE CONCRETE FORMWORK
PART 1 GENERAL
1.01 SECTION INCLUDES
A. American ConForm Industries SmartBlockPlus for cast-in-place insulated concrete,
with shoring, bracing and anchorage.
B. Required access for other work.
C. Form accessories.
1.02 INSTALLED BUT NOT FURNISHED PRODUCTS
D. Section 03300: Cast-In-Place Concrete: Supply of concrete accessories for placement
by this section. E. Section 04300: Supply of masonry accessories for placement by
this section.
F. Section 05500: Metal Fabrications: Supply of metal fabrications for placement
by this section.
1.03 RELATED SECTIONS
A. Section 03200: Concrete Reinforcement.
B. Section 03300: Cast-In-Place Concrete.
1.04 REFERENCES
C. ACI 301: Structural Concrete for Buildings.
D. ACI 318: Building Code Requirements for Reinforced Concrete.
E. ASTM C 578: Standard Specification for Preformed, Cellular Polystyrene Thermal
Insulation.
F. American ConForm Industries User's Manual for SmartBlockPlus Forms.
G. Structural Calculations for SmartBlockPlus Forms.
1.05 DESIGN REQUIREMENTS
A. A. All designing, engineering and construction of formwork, shoring and bracing
must conform to design and applicable code requirements. Concrete must conform to
required shape, lines and dimensions.
1.06 SUBMITTALS
A. Shop Drawings; identify required dimensions, materials, and arrangement.
B. Product Data; denotes form materials and installation requirements.
1.07 QUALITY ASSURANCE
A. Work is to conform to ACI 347.
B. Erection of formwork is the contractor's responsibility. Approval of the shop
drawings, by the architect of record, as submitted or as corrected does not relieve
the contractor of their responsibility to appropriately construct and maintain the
forms so that they will function properly.
1.08 REGULATORY REQUIREMENTS
A. Conform to applicable codes for designing, fabricating and erecting of formwork.
B. ICBO Evaluation Service, Inc. Report 4572; ConForm SmartBlockPlus Polystyrene
forms for reinforced concrete walls.
C. BOCA International Evaluation Services, Inc. Report 95·46: DIVISION 03, CONCRETE;
Section 03130 Permanent Forms.
1.09 DELIVERY, STORAGE, AND HANDLING
A. Deliver American ConForm Industries SmartBlockPlus Forms, installation instructions
and user reference manual as provided by manufacturer.
B. Store as strapped, banded or other prepackaged bundles and boxes provided by
the manufacturer to prevent damage. Protect from UV deterioration due to prolonged
exposure to direct sunlight.
1.10 COORDINATION
A. Coordination of this section, with other sections requiring attachment or embedment
of components or modification of formwork, must be prearranged.
B. If erection of the formwork results in insufficient concrete cover over reinforcement,
stop construction and request instructions from the Architect/Engineer of record.
PART 2 PRODUCTS
2.01 MANUFACTURERS: PREFABRICATED FORMS
A. American ConForm Industries; Product: SmartBlockPlus SF10 Standard Form.
B. Two opposing faces of EPS foam connected with an EPS foam bridge. An interlocking
tongue-and-groove is along top and bottom horizontal surfaces. Surface of exterior
is scored 1/16” deep on 2” increments to facilitate measuring and cutting.
C. Expanded Polystyrene Foam:
- Density: 1.5 – 2.0 pcf.
- Flame spread: ASTM E 84, 25 or less.
- Smoke Developed: ASTM E 84, 450 or less.
D. Substitutions: Under provisions of Section 01600.
2.02 MANUFACTURERS: UNASSEMBLED FORMS
A. American ConForm Industries; Product: SmartBlockPlus 12VWF Variable Width Form.
B. Two opposing faces of EPS foam connected with polypropylene connectors manually
inserted into preformed “T” slots in the foam. Connector flange is 1 ¼” wide by
6” long and after proper positioning, is ¼” below the surface of the foam panel.
An interlocking tongue-and-groove is along top and bottom horizontal surfaces. Surface
of exterior is scored 1/16” deep on 2” increments to facilitate measuring and cutting.
C. Expanded Polystyrene Foam:
- Density: 1.5 – 2.0 pcf.
- Flame spread: ASTM E 84, 25 or less.
- Smoke Developed: ASTM E 84, 450 or less.
D. Substitutions: Under provisions of Section 01600.
2.03 ACCESSORIES
A. Bracing: Commercially available systems or nominal lumber or steel framing members.
B. Cleat or Sleepers: Nominal lumber or steel framing members.
C. Tape: Release tape for securing, protecting and sealing slots, corners, adjustment
cuts, interlocking tongue and groove.
D. Nails, Tie Wire, Lag Bolts, Through Bolts, Anchorages: Sized as required, of
sufficient strength and composition to maintain formwork positioning while placing
concrete.
PART 3 EXECUTION
3.01 EXAMINATION
A. Dimensional lines, levels and centers of foundation must be verified before erecting
formwork. Dimensions must agree with drawings.
B. Strength of foundation concrete to be verified before proceeding with erecting
formwork.
3.02 ERECTION: FORMWORK
A. American ConForm Industries SmartBlockPlus Forms must be installed in accordance
with manufacturer's recommendations. Erect SmartBlockPlus forms in a running bond.
Corners are overlapped “log cabin” style. Protect forms and connectors from damage.
B. Erect formwork, shoring and bracing to achieve design requirements. All work
must conform to ACI 301 requirements.
C. Bracing and shoring must ensure stability of formwork and support construction
loads.
D. Design, erect, support, brace, and maintain formwork to support axial, lateral,
dynamic and static loads and moments that may occur until such forces can be resisted
by the concrete structure. Resultant concrete, members and structures must be of
correct shape, size, position, elevation and alignment.
E. Plumb and align all joints.
F. Approval of the Architect/Engineer of record must be obtained before framing
openings not indicated on drawings.
3.03 EMBEDDED PARTS, OPENINGS AND INSERTS.
A. Locate, set in place and stabilize items to be cast directly into concrete.
B. Openings, where required, must be formed and stabilized.
C. Work with other sections must be coordinated before locating, forming, placing
and stabilizing openings, sleeves, slots, pockets, recesses, bolts, anchors, other
inserts and components.
D. Positioning of items must conform to the appropriate section. Masonry anchors
must conform to spacing and intervals specified in Section 04300.
E. Manufactures instructions for installation of accessories must be followed. Positioning
must not be compromised during placement of the concrete.
3.04 FORM MAINTENANCE
A. Remove foreign matter on exterior and interior of forms before placing into position.
B. Cavities must be clear of debris prior to concrete placement.
C. Compressed air or water can be used to remove remaining foreign matter. Ensure
clean-outs allow water and debris can drain to exterior.
D. In cold weather, remove ice and snow from interior cavity of forms. Do not use
de-icing salts or other chemicals. Unless formwork is within heated space, do not
use water to clean out forms. Use compressed air or other method approved by the
Architect/Engineer of record to remove foreign matter.
E. Wall finishes requiring bonding to the EPS foam can only be applied to a clean
surface. Oxidation, from UV exposure, in the form of yellow dust must be removed
from the exterior surfaces. Mild detergent and a stiff brush or pressure washers
may be used. Rinse thoroughly with water.
3.05 TOLERANCES OF FORMWORK
A. Tolerances of formwork must be maintained in accordance with ACI 301.
3.06 FIELD QUALITY ASSURANCE
A. Before placement of concrete, inspect erected formwork, shoring, and bracing.
Ensure formwork conforms to design, stability and cleanliness and that shoring,
bracing, supports, fastenings, ties, accessories and other items are secure and
maintain their positions.
|