M. INSTALLATION OF UTILITIES

Electrical and plumbing lines install easily, and in accordance with code requirements, into SmartBlockPlus walls by simply cutting a channel into the foam after the concrete is placed and placing the wiring or piping into the channel. As there is fully 2-1/2” of foam insulation in the finished wall, you can fit a 2-1/2” O.D. diameter pipe or electrical conduit into the wall without any additional preparation. The channel is cut into the foam using a hot knife, or a router, which provides the necessary depth to meet code requirements. Electrical offset boxes can be cut in a like manner and screwed to the attachment stud with mechanical security, or glued into the wall with a foam adhesive.

International Patent - Copyright 2007 Ceramiche Bernini s.r.l.General Manager: Michele Caboni - mobile: (+39) 349 4263120
Office Import/Export Via Fabbri, 28 - 09170 Oristano (OR) - Sardinia - Italy
Ceramiche Bernini s.r.l. - ceramichebernini@yahoo.it - info@smartblockplus.com - Tel./Fax: (+39) 0783 251010

Partita IVA: 00682520952

Exclusive distributor for the countries:
Europa, Russia, Africa, Balcani (Albania, Bosnia Erzegovina, Croazia, Ex Republica Jugoslava,
Macedonia, Serbia, Montenegro, India, Pakistan, Middle East - Uninited Emirates excluded)